Six conditions that need to be met in the construction of pu sandwich panel production line

Author: Sinowa/Post Date: 2021-08-02/Keywords: pu sandwich panel production line

Sinowa is familiar with the trends of the thermal insulation industry at home and abroad, and always brings effective first information to the readers. Today, I will bring you six conditions that need to be met for the construction of the polyurethane sandwich panel production line:

First of all, the polyurethane sandwich panel base wall should meet the requirements of the specification, and it has been checked and accepted.

pu sandwich panel production line

The construction of the polyurethane sandwich panel project should be carried out after the base layer is painted with a cement mortar leveling layer and the construction quality is qualified.

Before the construction of the thermal insulation project, the outer door and window openings should pass the acceptance, the size and location of the openings should meet the design requirements and the acceptance should be qualified. The door and window frames or auxiliary frames should be installed and waterproofed. The embedded parts and connectors of fire ladders, downpipes, various entrance pipelines and air conditioners that extend out of the wall should be installed, and the thickness of the polyurethane sandwich panel should be reserved.

pu sandwich panel production line

External wall scaffolding for the installation of insulation boards is required, and the scaffolding should be stable and reliable.

The ambient temperature during construction should not be higher than 35℃, should not be lower than 5℃, and should not be lower than 0℃ within 24h, and the wind should not be higher than level 5. Rainproof measures should be taken during construction in rainy days.

pu sandwich panel production line

The incoming materials of polyurethane sandwich panels should be stored in a dry and cool place, and the storage period and conditions should be in accordance with the requirements of the material supplier’s product description.

The above is the construction requirements for polyurethane sandwich panels brought to you today. Sinowa is engaged in pu sandwich panel line equipment and has unique insights on the process of color steel insulation panels. More customers are welcome to come to consult.

Page Url: http://m.shionoe.com/en/six-conditions-that-need-to-be-met-in-the-construction-of-pu-sandwich-panel-production-line.html

You are here: Home / News / Six conditions that need to be met in the construction of pu sandwich panel production line
Contact Us
Email: sinowa@sinowa.cn
Call: +0086 151 0610 6366
Add: High-tech Industrial Development Zone, Zhenjiang, China
主站蜘蛛池模板: 97在线视频人妻无码| 波多野结衣 内射| 人妻少妇-嫩草影院| 无码专区狠狠躁躁天天躁| 国产成人精品成人a在线观看 | 欧美老熟妇喷水| 日本特黄特黄刺激大片| 国产激情久久久久影院小草| 激情 小说 亚洲 图片 伦| 亚洲av色男人的天堂| 精人妻无码一区二区三区| 熟女人妇 成熟妇女系列视频| 亚洲av无码一区二区三区波多野结衣| 成年男女免费视频网站| 日本熟妇厨房xxxxx乱| 最近2019好看的中文字幕免费| 国产真人无码作爱视频免费| 国产成年无码v片在线| 亚洲国产天堂久久综合| 欧美亚洲精品suv| 欧美videos另类极品| 法国啄木乌av片在线播放| 国产色视频免费| 一本一道色欲综合网中文字幕 | 日韩aⅴ人妻无码一区二区| 亚洲欧洲日产国码久在线| 欧美高清熟妇啪啪内射不卡自拍 | 毛片tv网站无套内射tv网站| 亚洲精品无码久久久久app| 亚洲av丰满熟妇在线播放| 亚洲色一区二区三区四区| 成 人免费va视频| 高潮毛片无遮挡高清视频播放 | 精品久久久久国产免费| 色久综合网精品一区二区 | 少妇无力反抗慢慢张开双腿| 久久香蕉超碰97国产精品| 九九精品99久久久香蕉| 国产精品亚洲一区二区三区在线| 女人的精水喷出来视频| 新狼窝色av性久久久久久|