Sinowa is familiar with the trends of the thermal insulation industry at home and abroad, and always brings effective first information to the readers. Today, I will bring you six conditions that need to be met for the construction of the polyurethane sandwich panel production line:

First of all, the polyurethane sandwich panel base wall should meet the requirements of the specification, and it has been checked and accepted.

pu sandwich panel production line

The construction of the polyurethane sandwich panel project should be carried out after the base layer is painted with a cement mortar leveling layer and the construction quality is qualified.

Before the construction of the thermal insulation project, the outer door and window openings should pass the acceptance, the size and location of the openings should meet the design requirements and the acceptance should be qualified. The door and window frames or auxiliary frames should be installed and waterproofed. The embedded parts and connectors of fire ladders, downpipes, various entrance pipelines and air conditioners that extend out of the wall should be installed, and the thickness of the polyurethane sandwich panel should be reserved.

pu sandwich panel production line

External wall scaffolding for the installation of insulation boards is required, and the scaffolding should be stable and reliable.

The ambient temperature during construction should not be higher than 35℃, should not be lower than 5℃, and should not be lower than 0℃ within 24h, and the wind should not be higher than level 5. Rainproof measures should be taken during construction in rainy days.

pu sandwich panel production line

The incoming materials of polyurethane sandwich panels should be stored in a dry and cool place, and the storage period and conditions should be in accordance with the requirements of the material supplier’s product description.

The above is the construction requirements for polyurethane sandwich panels brought to you today. Sinowa is engaged in pu sandwich panel line equipment and has unique insights on the process of color steel insulation panels. More customers are welcome to come to consult.

Page Url: http://m.shionoe.com/en/six-conditions-that-need-to-be-met-in-the-construction-of-pu-sandwich-panel-production-line.html

You are here: Home / News / Six conditions that need to be met in the construction of pu sandwich panel production line
Contact Us
Email: sinowa@sinowa.cn
Call: +0086 151 0610 6366
Add: High-tech Industrial Development Zone, Zhenjiang, China
主站蜘蛛池模板: av中文无码乱人伦在线观看| 国产亚洲av综合人人澡精品| 国产草草影院ccyycom| 人妻无码中文字幕免费视频蜜桃| 中文人妻无码一区二区三区| 人妻少妇乱子伦精品| 午夜亚洲福利在线老司机 | 三年片在线视频中国| 天天做天天摸天天爽天天爱| 免费观看激色视频网站| 熟女乱色一区二区三区| 国模欢欢炮交啪啪150| 国产精品久久成人网站| 欧美激情一区二区三区| 老师露出两个奶球让我吃奶头| 国产乱人伦真实精品视频| 欧美丰满熟妇xxxx性大屁股| 国产精品熟女一区二区| 一个人免费视频观看在线www| 国产精品制服丝袜无码| 比较有韵味的熟妇无码| 欧美a∨在线观看| 亚洲日韩精品无码专区网址 | 国产成人综合在线视频| 国产综合久久久久久鬼色| 亚洲自偷精品视频自拍 | 国产精品午夜无码体验区| 亚洲乱亚洲乱妇| 亚洲情xo亚洲色xo无码| 夜夜被两个男人玩得死去活来| 美女裸体视频永久免费| 亚洲精品无码av人在线观看国产| 亚洲自偷自偷在线成人网站传媒| 久久午夜夜伦鲁鲁片免费无码影视| 国产内射爽爽大片| 久久久精品日本一区二区三区| 久久久国产精华特点| 亚洲av综合色区无码二区爱av| 亚洲精品欧美精品日韩精品| 久久99热这里只有精品国产| 国产香蕉97碰碰久久人人|